SAP Home Learn Build Integrate Model Operate Extend with AI ConnectTutorial navigator Knowledge Graph API Devtoberfest Developer Advocates App Space

Manage my Account SAP Devs YouTube ↗ Learnings ↗ Community ↗ Provide Feedback ↗
Logout
โคข Open full site

Performing a Failback

How to initiate failbacks in HANA Studio

Overview

🎓 beginner 15 min. SAP HANA Dynamic TieringBeginnerBig DataSAP HANASAP HANA Studio

You will learn

  • โœ”The prerequisites needed to set up a Fail-back
  • โœ”How to perform a fail-back in HANA Studio
Unknown U Unknown November 1, 2022
Created by June 9, 2017
Contributors

Prerequisites

Prerequisites

  • Proficiency: Advanced
  • Tutorials Performing a Takeover
  • Credentials: Have access to the SYSTEM user of SystemDB and “<SID>adm” for a SSH session on the HANA hosts.

Steps

Time to Complete

15 Min


Step 1 Introduction
โ€”

To fail-back to your original primary system, you must switch the roles of your systems back to their original configuration. To do so, the original primary system will have to be started as a secondary system. After both systems are back in sync, you can perform a takeover on the original primary system.

Before you perform a fail-back, ensure that the following pre-requisites are met:

  • You are logged on to both systems as the operating system user (user <sid>adm) or are able to enter these credentials when prompted.
  • You have performed a data backup or storage snapshot on the current primary system. In multiple-container systems, the system database and all tenant databases must be backed up.
  • The original primary system is not running.
  • The current primary system is running.
Step 2 Performing a Failback
+

Resources

Discussion

Share feedback on this tutorial or join the conversation in SAP Community.

Submit detailed feedback Discuss in Community
Steps
Step 1 of 2
1. Introduction 2. Performing a Failback

Learn more →